Choose Your Project Department

COMPLETE PROJECT DEPARTMENTS

CHOOSE YOUR CURRENCY

[aelia_currency_selector_widget widget_type="dropdown"]

Amount: ₦5,000.00 |

Format: Ms Word |

1-5 chapters |



CHAPTER ONE

 

1.0     INTRODUCTION

1.1     BACKGROUND OF THE STUDY

In business reactions, stocks are the assets of the organization in terms of materials, goods products that need to be replenished at its re-ordered level. Therefore, stock control process is the operation of continuously arranging receipts and documents relating to the materials to ensure that stock balance are adequate to support the current rate of consumption with one regards to economy. There are some problems associated with stock process of organizations, which include inadequate control of information, that is, there was no free flow of information relating to the stock, also accuracy in the financial information status, and as a result of these problems therefore calls for the computerized approach to stock keeping, monitoring and sales analysis.

 

1.2     STATEMENT OF THE PROBLEM

The following are the specification statement of the problem that necessitated the project:

(a)        Customers time is wasted during search for an item in stock.

(b)        Fraud and arithmetic error normally occurs in the use of bin card.

Therefore, using a computerized approach for stock keeping, monitoring and sales analysis, it will helps in reducing customer’s complains.

 

1.3     PURPOSE OF THE PROJECT

Here are objectives of the project:

(a)        To reduce the lost of processing each unit of item

(b)        To ensure that goods in stock are made know to the approach department

(c)        To ensure that stock are replenished at re-order level as at when due.

 

1.4     SIGNIFICANCE OF THE PROJECT

(a)        It point out the important of operating research in management secession.

(b)        It makes the analysis of goods in stock faster and gasser management control.

(c)        It makes decision making at managerial level easy and faster

 

1.5     SCOPE OF THE PROJECT

The following are the scope of the project:

(a)        It considers how the customer consumes goods.

(b)        It cores the sues record of stock in store

(c)        It considers how goods are collected and received the store

 

1.6     LIMITATIONS OF THE PROJECT

Here are some limitations of the project:

(a)        Lack of materials

(b)        Time constraints

(c)        In ability to get the data to be in time.

(d)       Power failure

 

1.7     DEFINITION OF TERMS

(1)        Stock Record: These are the documents which record, from day to day, full particulars of individual’s receipts, and issues balances of stock.

(2)        Stock Taking/Checking: This is the process of physical verification of the quantities and condition of goods.

(3)        Re–Order level: This is the quantity between the maximum and minimum stock figuring at which it is necessary imitate Porsches requirement for new supplies.

(4)        Maximum Stock Level: Is the level at which stock should not be allowed to increase. In fixing this level, the best possible excepted conditions are used.

(5)        Minimum Stock Level: Is the level at which stock should not be allowed to full. The level must be wait – watched with cure because it is an indication of real change of “Stock” but which may result into production of sales stoppage.


This material content is developed to serve as a GUIDE for students to conduct academic research



AUTOMATED OF STOCK CONTROL AND SALES SYSTEM

NOT THE TOPIC YOU ARE LOOKING FOR?



PROJECTS TOPICS Support Team Are Always (24/7) Online To Help You With Your Project

Chat Us on WhatsApp » 09069999843

DO YOU NEED CLARIFICATION? CALL OUR HELP DESK:

  09069999843 (Country Code: +234)
 
YOU CAN REACH OUR SUPPORT TEAM VIA MAIL: projectstopics1@gmail.com


Related Project Topics :

LIST OF PROJECTS DEPARTMENTS